noscript
tags. Include a link to bypass the detection if you wish.
Mining and Hauling Operation
Land clearing and top soil removal inside pit and disposal area is the first stage of activity prior coal mining process. The soils were placed on the separated top soil stockpile before used for covering final reclamation area. The process of mining coals involves small-size mining equipment to remove overburden then carries raw coals to the ROM stockpile from PIT. Mining is conducted by open pit method by conventional truck and shovel.
Servo group have been operated coal mine project at Lahat Regency since
January 08. Coal was transported to Swarnadwipa Dermaga Jaya Port, a
company self owned port located at Tanjung Lago – Banyuasin Regency. Coal
production was limited by hauling capacity that was used province public
road. For developing any others coal mine project in South Sumatera, SERVO
has a strategic plan to build coal hauling road. The benefit of coal haul road
construction are :
- Increase coal resources extraction in South Sumatera
- Avoid coal hauling disruption and secure longterm coal supply
- Support a significant growth of national and world coal demand
- Support corporate mission to be a part of national and regional
economic growing