SITE MAP |
|
|||||||||
|
|
|||||||||
|
|||||||||
|
Integrated Coal Mining Developer
|
|
||||||||
|
Services
PT. SERVO MINING CONTRACTOR
Land clearing and top soil removal inside pit and disposal area is the first stage of activity prior coal mining process. The soils were placed on the separated top soil stockpile before used for covering final reclamation area. The process of mining coals involves small-size mining equipment to remove overburden then carries raw coals to the ROM stockpile from PIT. Mining is conducted by open pit method by conventional truck and shovel.
| |||||||||
|
| |||||||||