noscript
tags. Include a link to bypass the detection if you wish.
PT. SDJ was established in April 2008 and operates in October
2008, Port Tanjung Lago has 12 hectare areas with infrastructures
as follow:
- Port for barge 300 ft
- Loading Conveyor
- Crushing Plant
- Generator
- Weighing
- Stockpile
- Office and Mess,
- CCTV system
- VSAT
Port Tanjung Lago will continually be developed following servo
business development.